I am back in school so I have not had the time to sit down and write any updates. Things are progressing very well. The worst case scenario is that we will be in the house in 4 weeks. The sooner the better. The kids start school this week so that means driving them to and from school until we get into the house.
All the tiling is finished except one small corner of the wainscoting in the master bathroom. All that is left is the grout. All the cabinets are in. The closets have shelves. All the closets need are the poles installed. All the trim is finished and the doors are hung.
On the outside, the concrete is poured so we have a driveway and sidewalk past the house. Still need the sidewalk to the front door. The back patio and stoop are also finished.
They began putting stone on the outside of the house today. The main wall is almost finished. We hope to have our exterior colors picked tomorrow.
The interior of the house has been cleaned. The painters should begin tomorrow. Then we wait for fixtures and counter tops to be installed. Final plumbing and electrical work. And, of course, the rest of the flooring.