So we are on the countdown. The tentative close date is September 9. Elaine is sure they will have it finished. I'm on the fence. The outside of the house still needs to be painted. The wood floor is not finished. Most of the tiles need grout and the grout needs to be sealed.
On the bright side, most of the electrical work is finished. The furnace and heat pump have been installed. The sod is in.
We are impatiently waiting to see if it actually gets finished. I have been having bad house dreams.
No comments:
Post a Comment