The drywall was delivered today. I have never seen 12 foot sheets. They are huge. In addition to the drywall, the water has been turned on in the house and the sewer line was connected. Several truckloads of dirt were also dumped on the yard.
The final preliminary electrical work was completed. The builder had the insulation crew finish up a couple of things.
On the outside, the stairs on the deck are almost complete.
The drywalling will begin tomorrow. It will be nice to see the walls.